- 1 Which authority publish schedule of rates?
- 2 Who prepares the schedule of rates?
- 3 What percentage of total cost is added to the schedule of rates?
- 4 How does a schedule of rates work?
- 5 What is the difference between a bill of quantities and an activity schedule?
- 6 What is a rate analysis?
- 7 Which is the PWD schedule of rates for 2018?
- 8 Where can I find the schedule of rates?
Government department publishes schedule of rates. For India, schedule of rates is published by Central Public Works Department (CPWD). This is an organization under the Government of India. Schedule of rates is a list that includes various items.
What are standard schedule rates?
The Schedule of Rates provides a basic frame work to evaluate cost estimate of the projects. In the process of project costing based on this Schedule of Rates, the additional cost involved in carriage of materials from approved sources to site of work shall be added to arrive at the actual execution cost.
Who prepares the schedule of rates?
A schedule or list of rates of various items is prepared after the analysis of rates of these items. Such a document is known as the schedule of Rates or S.O.R. It is prepared by large concerns or public bodies such as Central Public Works Department (CPWD), State Governments etc.
What is Delhi Schedule of Rates?
2. Delhi Schedule of Rates 2012 is based on the prevailing market rates of materials in Delhi between April 2011 to Sept. of Delhi w.e.f. 1/4/2011.3. The Cost Index based on Delhi Plinth Area Rates – 2007 as base 100 as on 1/10/2007, as corre- sponds to DSR 2012, is 149.4.
What percentage of total cost is added to the schedule of rates?
Detailed Solution 10 % of the total cost is added to the schedule of rates of the public work department for over-head cost.
What is basic rate in construction?
The basic rates are calculated by adding transportation cost, national and loacal taxes on the base rate inwhich the material is purchased from the original source.
How does a schedule of rates work?
A schedule of rates is a table of rates for specific activities that can be used to negotiate commercial terms when the broad activities are known but not the precise quantities. Schedule of rates contracts lend themselves to be used in two different situations.
What does PSA schedule of Rates stand for?
The Schedule of Rates is the best-known rate guide in the construction industry and is the standard document used in public sector construction work. The Schedule of Rates is the best-known rate guide in the construction industry and is the standard document used in public sector construction work.
What is the difference between a bill of quantities and an activity schedule?
These two forms of contract rely on an activity schedule rather than a bill of quantities. In simple terms, an Activity Schedule breaks the works down into parts (i.e. activities) which a tendering contractor then both prices and has to show in his programme.
What is the difference between a bill of quantities and a schedule of works?
A Schedule of Works is a contract document that lists the works required on a project. Schedule of Works differ from traditional bills of quantities as each description in the list of the works required is priced as an ‘item’ rather than a quantity.
What is a rate analysis?
Rate analysis is the basis for arriving at a correct rate per unit work or supply of work specifications such as labor, materials, and equipment. It can also be defined as the analytical study that leads to the definition of unit rates of work by identifying the basic requirements.
What is the purpose of schedule of rates?
Schedule of Rates means any schedule included in the Contract which, in respect of any section or item of the Services to be carried out, shows the respective rate (Fee) of payment for performance of that service and which may also include lump sums, other sums, quantities and prices.
Which is the PWD schedule of rates for 2018?
ANALYSIS OF PWD SCHEDULE OF RATES 2018 FOR CIVIL WORKS FIFTEENTH EDITION PUBLIC WORKS DEPARTMENT GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH EFFECTIVE FROM 01 MAY 2018 f© Public Works Department Published by: Public Works Department Purta Bhaban, Segun Bagicha Dhaka-1000.
Which is PWD schedule of rates for civil works public?
Analysis of rates are based on study of price of various input such as material, labour, machine etc. of Dhaka, other metropolitan cities and district towns collected during the period of September 2017 to April 2018. Preparation of such document within a short span of time is a challenging task.
Where can I find the schedule of rates?
Apart from C.P.W.D., this Schedule of Rates is used as a guide by many departments, institutions, public sector undertakings, architects, builders, contractors, etc.